Case study · Frozen food · Scarborough, Ontario

From 61% to 78% OEE in twelve weeks.

A family-run dumpling plant was working overtime every Friday and still missing orders. We made the losses visible, fixed the three biggest, and automated the reporting so the gains stuck.

Illustrative case built from issues common in GTA food plants. The plant is a composite; figures show the method and typical results.

OEE
61 → 78%
Changeover
55 → 22 min
Giveaway
4.2 → 1.1%
Rejects
1.8 → 0.7%
Overtime
−70%
Payback
~5 mo
OEE
61 → 78%
Changeover
55 → 22 min
Giveaway
4.2 → 1.1%
Rejects
1.8 → 0.7%
Overtime
−70%
Payback
~5 mo
The problem

The whiteboard said running. The data said otherwise.


Two dumpling forming lines feed one spiral freezer and one bagger packing 454 g bags. About 60 staff on two shifts.

AreaWhat the owner sawWhat the data showed
ProductionOutput swinging ±25%55-minute changeovers, never timed. Freezer half-empty while forming caught up.
ProductivityOvertime every FridayShort stops under 5 min added up to 38 min a shift, never recorded.
QualityUnderweight complaintsFiller set high to be safe: 4.2% giveaway, and 1.8% still rejected.
How we work

Diagnose. Decide. Deliver.


01

Diagnose

Where is the time going?
  • Changeover time studies
  • Stop log for 10 shifts
  • Loss tree to good bags
02

Make it visible

Can the floor see it live?
  • PLC counters and checkweigher connected
  • Shift dashboard on a TV at the line
  • Stop reasons on a tablet
03

Decide and fix

Which three losses matter most?
  • SMED with a spare forming head
  • Filler control from checkweigher data
  • Freezer loading at forming rate
04

Deliver and hand over

Will it hold without us?
  • 6:00 AM daily report by email
  • Alarm rules to the supervisor
  • SOPs and operator training
Live demo

The dashboard the plant runs on.


Switch between Before and After to see every screen change.

Line 1 · Pork & Chive 454 g · Day shift · 14:20

Output by hour bags, target 600/h

Machine status this shift

RunningChangeoverStoppedWaiting

Downtime by reason min per shift

What changed

ReasonBeforeAfter

Bag weight distribution g, label 454 g

Hourly mean weight SPC ±3σ

Changeover steps min, Pork & Chive to Har Gow

Daily report sent 6:00 AM

Alarm rules

  • Bag weight drifts over 3σ for 10 min: text the supervisor.
  • Line stopped over 5 min with no reason: prompt the operator tablet.
  • Freezer load under 70% for 15 min: flag forming as bottleneck.
  • Metal detector reject: stop bagger, log for HACCP.
  • Changeover 10 min over standard: notify maintenance lead.
SourceDataBefore
Forming PLCsCounts, run/stopNot read
CheckweigherEvery bag weightDisplay only
Freezer controllerBelt load, tempPaper chart
Operator tabletStop reasons, CCPsClipboard
Your plant

What would ten OEE points be worth to you?


Estimated extra contribution per year
$0

Tell us about your line ↗

Illustrative case study: the plant and data are a composite.